Village of Fox Lake Infrastructure Strategic Planning Team Met Sept. 1.
Here is the agenda provided by the team:
1. Call to Order
A. Pledge of Allegiance
B. Roll Call
2. Approval of Minutes
A. August 4, 2021
3. New Business
A. Public Works Project Updates
B. Nippersink Blvd
• Audio Smith Parking
• Lighting
• Metra Facility
• Depot Tire Paving
C. Roadway project updates
D. South Holly Ave
E. Well 5 replacement
F. Emergency Services RFP
G. Engineering RFP
H. Sewer Lining
I. Hydrant Painting
J. Interconnect Phase 2
K. Route 12 Sidewalk
• AUP
L. Washington St Engineering
M. Hickory Cove Engineering
N. Lincoln Watermain replacement
O. High School Lift Station
P. US 12 Median
Q. NWRWRF Project Updates
4. Old Business
A. Lakefront Park
B. Truck purchases
C. Fossil Bridge
D. SCADA updates
E. Route 12/Hartigan Signage-IGA
F. Knollwood
5. Public Comments
6. Next Meeting Date
7. Adjournment
https://www.foxlake.org/ArchiveCenter/ViewFile/Item/2237